Publisher
Springer Nature Switzerland
Reference10 articles.
1. Herroelen, W., De Reyck, B., Demeulemeester, E.: Resource-constrained project scheduling: Notation, classification, models and methods. Eur. J. Oper. Res. 128(3), 221–230 (2000)
2. Brucker, P., Knust, S.: Complex Scheduling. Springer-Verlag, Berlin Heidelberg (2012)
3. Tellache, N.E.H., Boudhar, M.: Flow shop scheduling problem with conflict graphs. Ann. Oper. Res. 261(1–2), 339–363 (2017). https://doi.org/10.1007/s10479-017-2560-x
4. Chen, Y., Goebel, R., Lin, G., Su, B., Zhang, A.: Open-shop scheduling for unit jobs under precedence constraints. Theor. Comput. Sci. 803, 144–151 (2020)
5. Gao, Y., Xie, Z., Liu, X., Zhou, W., Yu, X.: Integrated scheduling algorithm based on the priority constraint table for complex products with tree structure. Adv. Mech. Eng. 12(12), 1–15 (2020)