Author:
Mirriam A. Jemshia,Rajashree S.,Muneera M. Nafees,Saranya V.,Murali E.
Publisher
Springer Nature Switzerland
Reference14 articles.
1. Bourcier, W.L., Wolery, T.J., Wolfe, T.: A preliminary cost and engineering estimate for desalinating produced formation water associated with carbon dioxide capture and storage. Int. J. Greenhouse Gas Control 5(5), 1319–1328 (2011)
2. Aibinu, A.A., Pasco, T.: The accuracy of pretender building cost estimates in Australia. Construction Manage. Econo. 26(12), 1257–1269 (2008)
3. Narbaev, T.: Analysis of causes of delay and time performance in construction projects. J. Constr. Eng. Manag. 140(1), 999–1003 (2014)
4. Sheta, A.F., Ayesh, A., Rine, D.: Evaluating software cost estimation models using particle swarm optimisation and fuzzy logic for NASA projects: a comparative study. Int. J. Bio-Inspired Computation 2(6), 365–373 (2010)
5. Lin-Yu, Y.U., Sun, W.J., Wang, A.L.: A method of cost estimate based on component software simulation. Computer Simulation 23(12), 93-95 (2006)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Cognitive Processes in the Digital Realm;Advances in Computational Intelligence and Robotics;2024-04-05