Author:
Lafond Daniel,Couture Dave,Delaney Justin,Cahill Jessica,Corbett Colin,Lamontagne Gaston
Publisher
Springer International Publishing
Reference16 articles.
1. Ahluwalia, R., Pinha, D.: Decision support system for production planning in the ship repair industry. Ind. Syst. Eng. Rev. 2(1), 52–61 (2014)
2. Bertrand, E.L.J.: Optimization of the naval surface ship resource-constrained project scheduling problem. Doctoral thesis. Dalhousie University, Halifax (2020)
3. Kelley, Jr. J.E., Walker, M.R.: Critical-path planning and scheduling. In: Papers Presented at the 1–3 December 1959, Eastern Joint IRE-AIEE-ACM Computer Conference, pp. 160–173 (1959)
4. Malcolm, D.G., Roseboom, J.H., Clark, C.E., Fazar, W.: Application of a technique for research and development program evaluation. Oper. Res. 7(5), 646–669 (1959)
5. Brucker, P., Drexl, A., Möhring, R., Neumann, K., Pesch, E.: Resource-constrained project scheduling: Notation, classification, models, and methods. Eur. J. Oper. Res. 112(1), 3–41 (1999)
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献