Publisher
Springer International Publishing
Reference13 articles.
1. Bienstock, D., Zuckerberg, M.: A new LP algorithm for precedence constrained production scheduling.
http://www.optimization-online.org/DB_HTML/2009/08/2380.html
2. Boland, N., Dumitrescu, I., Froyland, G., Gleixner, A.M.: LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity. Comput. Oper. Res. 36(4), 1064–1089 (2009)
3. Chicoisne, R., Espinoza, D., Goycoolea, M., Moreno, E., Rubio, E.: A new algorithm for the open-pit mine production scheduling problem. Oper. Res. 60(3), 517–528 (2012)
4. Everett, J.E.: Planning an iron ore mine: from exploration data to informed mining decisions. Issues Inform. Sci. Inform. Technol. 10(1), 145–162 (2013)
5. Goldberg, A., Tarjan, R.: A new approach to the maximum-flow problem. J. Assoc. Comput. Mach. 35(4), 921–940 (1988)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献