Author:
Kurtuk Ismail Can,Polkinghorne Martyn
Publisher
Springer Nature Switzerland
Reference91 articles.
1. Ahsan, K., Ho, M., & Khan, S. (2013). Recruiting project managers: A comparative analysis of competencies and recruitment signals from job advertisements. Project Management, 44(5), 36–54. https://doi.org/10.1002/pmj.21366
2. Ashleigh, M., Ojiako, G., Chipulu, M., & Kai Wang, J. (2012). Critical learning themes in project management education: Implications for blended learning. Project Management, 30(2), 153–161. https://doi.org/10.1016/j.ijproman.2011.05.002
3. Atkinson, R. (1999). Project management: Cost, time and quality, two best guesses and a phenomenon, it’s time to accept other success criteria. International Journal of Project Management, 17(6), 337–342. https://doi.org/10.1016/S0263-7863(98)00069-6
4. Bakht, M., & El-Diraby, T. (2015). Synthesis of decision-making research in construction. Construction. Engineering Management, 141(9), 04015027-1–04015027-18. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000984
5. Ballesteros-Sanchez, L., Ortız-Marcos, I., Rodriguez-Rivero, R., & Juan-Ruiz, J. (2017). Project management training: An integrative approach for strengthening the soft skills of engineering students. Engineering Management, 33(6), 1912–1926. https://www.ijee.ie/latestissues/Vol33-6A/20_ijee3526ns.pdf