1. Bartholdi, J. J., Bunimovich, L. A., & Eisenstein, D. D. (1999). Dynamics of two- and three-worker "Bucket Brigade" production lines. Operations Research, 47, 488–491.
2. Bartholdi, J. J., & Eisenstein, D. D. (1996). A production line that balances itself. Operations Research, 44, 21–34.
3. Hirotani, D., Morikawa, K., & Takahashi, K. (2008). Analysis and design of self-balancing production line with large number of workers and stations. In Proceedings of the 9th Asia pacific industrial engineering & management systems conference (APIEMS 2008). Denpasar.
4. Hirotani, D., Morikawa, K., & Takahashi, K. (2009). Analysis of self-balancing production line with stations, non preemption, and constant working velocity. In Proceedings of the 10th Asia pacific industrial engineering & management systems conference (APIEMS 2009), Kitakyushu, Japan (pp. 1428–1434) (CD-ROM).
5. Hirotani, D., Morikawa, K., & Takahashi, K. (2017). Worker coordination policy for self-balancing production line with worker and station dependent speed. In Proceedings of the 18th Asia pacific industrial engineering & management systems conference (APIEMS 2017), Yogyakarta, Indonesia, A8-13-A8-18 (USB).