1. Idiake, J.E., Shittu, A.A., Anunobi, A.I., Akanmu, W.P.: A comparative analysis of Traditional and Design & Build method of procurement in the Nigerian construction Industry. Int. J. Constr. Eng. Manage. 4(1), 1–12 (2015)
2. Khodadadi, S.A.T., Kumar, B.D.: Contractor selection with risk assessment by using AHP Fuzzy method. Int. J. Adv. Eng. Technol. 5(2), 311–318 (2013)
3. Udensi, C.U.: Problems in the implementation of due process. In: Proceedings of the 35th Annual General Meeting/Conference of Nigeria Institute of Building (NIOB) at Abia State, 10th–14th August 2005 (2005)
4. Wong, C.H., Holt, G.D.: Developing a contractor classification model using a multivariate discriminant analysis approach. RICS Found. Res. Pap. Ser. 4(20), 1–23 (2004)
5. Salama, M., El Aziz, H.A., El Sawah, H., El Samadony, A.: Investigating the criteria for contractors’ selection and bid evaluation in Egypt. In: Boyd, D. (ed.) Proceeding 22nd Annual ARCOM Conference, 4–6 September 2006, Birmingham, UK, Association of Researchers in Construction Management, pp. 531–540 (2006)