Author:
Loures Paulo Cézar,Scavarda Luiz Felipe,de Carvalho Andréa Regina Nunes
Publisher
Springer International Publishing
Reference39 articles.
1. Lazim, H. M., and Ramayah, T. (2010). Maintenance strategy in Malaysian manufacturing companies: a total productive maintenance (TPM) approach. Business Strategy Series, 11 (6), 387–396.
2. Musmam, A.H, and Ahmad, R. (2018). Critical component identification and autonomous maintenance activities determination using fuzzy analytical hierarchy process method. International Journal of Industrial and Systems Engineering 28 (3), 360–378.
3. Mugwindiri, K. and Mbohwa, C. (2013) Availability performance improvement by using autonomous maintenance: the case of a developing country, Zimbabwe’, World Congress on Engineering, July, England.
4. Ahuja, I.P.S., and Khamba, J.S. (2008). Strategies and success factors for overcoming challenges in TPM implementation in Indian manufacturing industry. Journal of Quality in Maintenance Engineering, 14 (2), 23–147.
5. Rajesh, A., Sandeep, G., Nikhil, D., and Deepak, Kumar. (2012). Analysis of barriers of Total Productive Maintenance (TPM). International Journal of Systems Assurance Engineering and Management, 4 (4), 365–377.