1. Box, G. E., & Jenkins, G. M. (1976). Time series analysis: Forecasting and control. Holden-Day.
2. Brockwell, P. J., & Davis, R. A. (2016). Introduction to time series and forecasting. Springer.
3. California Department of General Services. (2019). DGS California Construction Cost Index CCCI, available at: https://www.dgs.ca.gov/RESD/Resources/Page-Content/Real-Estate-Services-Division-Resources-List-Folder/DGS-California-Construction-Cost-Index-CCCI. Classical and modern. Univ. of the West Indies Press.
4. Engle, R. F. (1982). Autoregressive conditional heteroscedasticity with estimates of the variance of United Kingdom inflation. Econometrica: Journal of the econometric society, 987–1007.
5. Federal Highway Administration (FHWA). (2019). National Highway Construction Cost Index (NHCCI), available at: https://www.fhwa.dot.gov/policy/otps/nhcci/desc.cfm