1. ISO and Construction, ISBN 978-92-67-10779-0 (2017)
2. Gershon, R.R.M., Magda, L.A., Riley, H.E.M., Sherman, M.F.: The World Trade Center evacuation study: factors associated with initiation and length of time for evacuation. Fire Mater. 36, 481–500 (2012)
3. Fire Alarm Systems Market Driven by Rapid Growth in Developing Nations. ARC AdvisoryGroup.
https://www.arcweb.com/press/fire-alarm-systems-market-driven-rapid-growth-developing-nations
4. Wang, B., Li, H., Rezgui, Y., Bradley, A., Ong, H.N.: BIM based virtual environment for fire emergency evacuation. Sci. World J. 2014, 1–22 (2014)
5. Ma, J., Jia, W., Zhang, J.: Research of building evacuation path to guide based on BIM. In: 29th Chinese Control and Decision Conference (CCDC), pp. 1814–1818. IEEE Press, Chongqing (2017)