Author:
Karaz Mahmoud,Teixeira José Cardoso,Rahla Kamel Mohamed
Publisher
Springer International Publishing
Reference52 articles.
1. Akinade, O. O., et al. (2015). Waste minimisation through deconstruction: A BIM based Deconstructability Assessment Score (BIM-DAS). Resources, Conservation and Recycling, 105, 167–176.
2. APA (Agência Portuguesa do Ambiente). (2018). Fluxos Específicos de Resíduos & Resíduos de Construção e Demolição. Agência Portuguesa do Ambiente. Available at:
https://www.apambiente.pt/index.php?ref=16&subref=84&sub2ref=197&sub3ref=283
. (Retrieved February 1, 2019).
3. Ballard, G. (2000). The Last Planner System of Production Control. School of Civil Engineering—Faculty of Engineering Doctor of, University of Birmingham, UK.
4. Banias, G., Achillas, C., Vlachokostas, C., Moussiopoulos, N., & Papaioannou, I. (2011). A web-based decision support system for the optimal management of construction and demolition waste. Waste Management, 31, 2497–2502.
5. Bilal, M., et al. (2016). Big data architecture for construction waste analytics (CWA): A conceptual framework. Journal of Building Engineering, 6, 144–156.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献