1. Y.J.-T. Zidane, B. Andersen, The top 10 universal delay factors in construction projects. Int. J. Manag. Proj. Bus. 11(3), 650–672 (2018)
2. I. Haarstad, R.K. Nyberg, O. Mydland, H. Gustad, J. Lindland, Statoil Global Operations: Exploiting 24/7 operational support for well construction from different geographical location in three time-zones, in Paper Presented at the Intelligent Energy Conference and Exhibition SPE-112137-MS, (Amsterdam, The Netherlands, 2008)
3. E.K. Morgan, M.J. Lato, LiDAR in underground constructions: A case study from a water storage Cavern, Norway, in Paper Presented at the ISRM International Symposium - ISRM-EUROCK-2012-015, (Stockholm, Sweden, 2012)
4. P. Piantanida, A. Gottfried, G.M. Di Giuda, V. Villa, Controls on structure execution: acceptance conditions and types of inspection for cast on site reinforced concrete, in New Developments in Structural Engineering and Construction, (2013), pp. 461–466
5. O. Matas, R. Dandod, M. Subikova, D. Zdansky, Geodetic works on the construction of the hydropower plant in Kjensvatn, Norway, in International Multidisciplinary Scientific GeoConference Surveying Geology and Mining Ecology Management, (Sofia, Bulgaria, 2013)