1. Chung, J., Kim, P.S.: A performance model for stocker systems in liquid crystal display (LCD) fabrication lines. J. Soc. Korea Ind. Syst. Eng. 34(3), 1–7 (2011)
2. Eldemir, F., Graves, R.J., Malmborg, C.J.: New cycle time and space estimation models for automated storage and retrieval system conceptualization. Int. J. Prod. Res. 42(22), 4767–4783 (2004)
3. Gu, S.J., Choi, B.K.: Simulation model of TFT-LCD line in-line stocker. In: Proceedings of Conference of Korean Industrial Engineering Society, pp. 288–294 (2008)
4. Ho, Y.C., Su, T.S.: The machine layout within a TFT-LCD bay with a multiple-stacker crane in-line stocker. Int. J. Prod. Res. 50(18), 5152–5172 (2012)
5. Kim, J.H., Park, J.H., Hong, S.P., Hong, C.H., Park, N.I., Jang, Y.J., Kim, S.I., An, S.J. Moon, I.H.: Optimization of transport zoning in consideration of crane utilization in LCD dual stacker. In: Proceedings of Conference of Korean Industrial Engineering Society. 1991–2013 (2016)