1. Dang Y, Liu S, Liu B (2012) Models for initial conditions. Chin Manag Sci 2:132–135
2. He B, Meng Q (2012) Research on the extension method of grey prediction model. Syst Eng Theor Pract 9:137–140
3. Wang Z, Peng X, Dai Q (2015) Improvement and application of grey prediction model based on initial value correction. Chongqing Inst Technol 21(10):81–84
4. Tan C (2017) Background value construction method and application of the model (I). Syst Eng Theor Pract 4:98–103
5. Wang Z, Wu C (2013) Improved model and its application. Pract Underst Math 33(9):20–25