Author:
Ambrosino Daniela,Asta Veronica
Publisher
Springer International Publishing
Reference19 articles.
1. Ambrosino, D., Siri, S.: Comparison of solution approaches for the train load planning problem in seaport terminals. Transp. Res. E Logist. Transp. Rev. 79, 65–82 (2015)
2. Berthold, T., Heinz, S., Lübbecke, M.E., Möhring, R.H., Schulz, J.: A constraint integer programming approach for resource-constrained project scheduling. In: International Conference on Integration of Artificial Intelligence (AI) and Operations Research (OR) Techniques in Constraint Programming, pp. 313–317 (2010)
3. Bohlin, M., Hansmann, R., Zimmermann, U.T.: Optimization of railway freight shunting. Computers & industrial engineering. In: Borndörfer, R., Klug, T., Lamorgese, L., Mannino, C., Reuther, M., Schlechte, T. (eds.) Handbook of Optimization in the Railway Industry. International Series in Operations Research & Management Science, vol. 268. Springer, Cham (2018)
4. Cacchiani, V., Huisman, D., Kidd, M., Kroon, L., Toth, P., Veelenturf, L., Wagenaar, J.: An overview of recovery models and algorithms for real-time railway rescheduling. Transp. Res. B Methodol. 63, 15–37 (2014)
5. Corman, F., D’Ariano, A., Pacciarelli, D., Pranzo, M.: A tabu search algorithm for rerouting trains during rail operations. Transp. Res. B Methodol. 44, 175–192 (2010)
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献