Author:
Kikwasi Geraldine J.,Sospeter Nyamagere Gladys
Publisher
Springer International Publishing
Reference24 articles.
1. Al-Werikat G (2017) Supply chain management in construction: revealed. Int J Sci Ad Technol Res 6(3):106–110
2. Amade B, Akpan EOP, Ubani EC, Amaeshi UF (2016) Supply chain management and construction project delivery: constraints to its application. PM World Journal V(V), 1–19
3. Aziz RF, Hafez SM (2013) Applying lean thinking in construction and performance improvement. Alexandria Eng J 52
4. Battula VR, Namburu SK and Kone V (2020) A study on factors involved in implementation of supply chain management in construction industry. Materials Today: Proceedings, https://doi.org/10.1016/j.matpr.2020.04.900
5. Comrode D (2019) 14 factors that delay a construction project’s timelines [online]. Available at https://comrode.com. Accessed 7th Feb 2020
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献