1. Baptiste, P.: Polynomial time algorithms for minimizing the weighted number of late jobs on a single machine with equal processing times. J. Sched. 2(6), 245–252 (1999)
2. Boyer, S.A.: SCADA: Supervisory Control and Data Acquisition. International Society of Automation, 4th edition (2010)
3. Briskorn, D., Choi, B.-C., Lee, K., Leung, J., Pinedo, M.: Inventory constrained scheduling on a single machine. Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 640, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre (2008)
4. Briskorn, D., Choi, B.-C., Lee, K., Leung, J., Pinedo, M.: Complexity of single machine scheduling subject to nonnegative inventory constraints. Eur. J. Oper. Res. 207(2), 605–619 (2010)
5. Bäumker, E., Schüle, F., Woias, P.: Development of a batteryless VHF-beacon and tracker for mammals. In: Journal of Physics: Conference Series, vol. 1052, p. 012005 (2018)