Author:
Litvinov Volodymyr,Bovnegra Liubov,Pavlyshko Andrey,Toropenko Alla,Babych Yuliia
Publisher
Springer Nature Switzerland
Reference12 articles.
1. Litvinov, V., Litvinov, A.: Implementation project risk management. In: Modern Technologies and Design Art. Monograph. Vol. 2: Series of monographs Faculty of Architecture, Civil Engineering and Applied Arts Katowice School of Technology, pp. 65–71. Publishing House of Katowice School of Technology (2020)
2. Litvinov, V.: Termodynamic approach to the project risks determination .EEJET, 1(10), 61. (2017)
3. Steven, P.: Managing incomplete knowledge: why risk management is not sufficient. Int. J. Project Manage. 19(2), 79–87 (2001)
4. Singh, V.P.: F.ASCE, derivation of the Singh-Yu infiltration equation using entropy theory. J. Hydrol. Eng. 187–191 (2011)
5. Ge, X.-M., Liu, X.-J.: Application of entropy measurement in risk assessment of the engineering project of construction-agent system. Syst. Eng. Procedia 1, 244–249 (2011)