Author:
Nural Ece,Sanisoğlu Ceren,Ermiş Esennur,Ünver Sinem,Gürçay Zehra,Düzgit Zehra
Publisher
Springer International Publishing
Reference7 articles.
1. Pinedo, M.L.: Planning and Scheduling in Manufacturing and Services, 2nd edn. Springer, New York (2009)
2. Graham, R.L., Kan, A.H.G.R.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics. Erasmus University, Rotterdam (1979)
3. Kurz, M.E., Askin, R.G.: Scheduling flexible flow lines with sequence-dependent setup times. Eur. J. Oper. Res. 159(1), 66–82 (2004).
https://doi.org/10.1016/s0377-2217(03)00401-6
4. Harbaoui, H., Morineau, O.B., Khalfallah, S.: Scheduling a two-stage hybrid flow shop with dedicated machines, time lags and sequence-dependent family setup times. In: 2016 IEEE 46 International Conference on Systems, Man, and Cybernetics (SMC) (2016).
https://doi.org/10.1109/smc.2016.7844695
5. Temizsoy, A., Göllü, İ., Kaplan, E., Özköse, S., Aydoğan, Z., Acar, T.: Hybrid flow shop scheduling. The Senior Design Project of The Industrial Engineering Students at Yaşar University (2018)