Author:
Noushad Nilufer,Saud S. Jawahar,Neduvancheri Shamnas
Publisher
Springer Nature Switzerland
Reference20 articles.
1. Alsulaiti AA, Kerbache L (2020) Analysis of critical delay factors in construction projects with a focus on Qatar. Int J Bus Econ Res 9(3):130. https://doi.org/10.11648/j.ijber.20200903.16
2. Ameyaw EE, Hu Y, Shan M, Chan APC, Le Y (2016) Application of Delphi method in construction engineering and management research: a quantitative perspective. J Civil Eng Manag 22(8):991–1000. https://doi.org/10.3846/13923730.2014.945953
3. Amrut Sisodiya K, Radhesham Karwa R, Devidas Ghadge D, Pandurang Wanjale N (2020) www.jetir.org (ISSN-2349–5162). In: JETIR2003201 J Emeg Technol Innovative Res 7(3) www.jetir.org
4. Aneesh Chandran (2019) Villages outgrowing cities in Kerala; Huge rise in number of buildings Read more at: https://englisharchives.mathrubhumi.com/news/kerala/villages-outgrowing-cities-in-kerala-huge-rise-in-number-of-buildings-1.3949430
5. Atout MM (n d) International conference on management and information systems factors caused by consultant engineers affecting project progress