1. Van Bevern, R.A., Pyatkin, A.V., Sevastyanov, S.V.: An algorithm with parameterized complexity of constructing the optimal schedule for the routing open shop problem with unit execution times. Siber. Electron. Math. News 16, 42–84 (2019)
2. Tanaev, V.S., Gordon, V.S., Shafransky, J.M.: Schedule Theory. Single Stage. The Science, Moscow (1984)
3. Moder, J.J., Elmaghraby, S.E.: Handbook of Operations Research: Models and Applications. Van Nostrand Reinhold, New York (1978)
4. Aksyonov, K.A., Antonova, A.S., Aksyonova, O.P., Kai, W.: Rules for construction of simulation models for production processes optimization. In: 3rd International Workshop on Radio Electronics and Information Technologies, vol. 2076, pp. 9–18 (2018)
5. Microsoft Project. https://www.microsoft.com/en-gb/microsoft-365/project/project-management-software. Accessed 01 Sept 2021