1. Kozlov, N.A., Popova, K.A.: Problems of implementing BIM design technologies in Russia. Tech. Regul. Transp. Constr. 1(15), 18–21 (2016)
2. Soboleva, A.A., Perepelitsa, F.A., Sokurenko, Y.A.: Advantages of BIM technology at the stages of the life cycle of an object. Almanac of Scientific Works of Young Scientists of ITMO University: Collection Of Proceedings of the Conference. St. Petersburg, pp. 19–21 (2016)
3. Lushnikov, A.S.: Problems and advantages of the implementation of BIM technology in construction companies. Bull. Civ. Eng. 6(53), 252–256 (2015)
4. Gribkova, I.S., Ekutech, M.V.: BIM at all stages of the life cycle of a building. Electron. Netw. Polythematic J. “Scientific Works of the Kuban State Technological University” 2, 222–234 (2018)
5. Belyaev, A.V., Antipov, S.S.: The life cycle of construction objects in information modeling of buildings and structures. Ind. Civ. Constr. 1, 65–72 (2019)