1. Blais, J.A.R.: Least squares for practitioners. Math. Probl. Eng. 2010, 19 (2010)
2. Chen, Y., Breen, P., Andrew, N.L.: Impacts of outliers and mis-specification of priors on Bayesian fisheries-stock assessment. Can. J. Fish. Aquat. Sci. 57, 2293–2305 (2000). https://doi.org/10.1139/f00-208
3. Jaulin, L., Kieffer, M., Didrit, O., Walter., E.: Applied Interval Analysis. In: Software Engineering/Programming and Operating Systems. Springer-Verlag, London (2001). https://doi.org/10.1007/978-1-4471-0249-6
4. Sandretto, J.A., Trombettoni, G., Daney, D., Chabert, G.: Certified calibration of a cable-driven robot using interval contractor programming. In: Thomas, F., Perez Gracia, A. (eds.) Computational Kinematics. Mechanisms and Machine Science, vol 15. Springer, Dordrecht (2014). https://doi.org/10.1007/978-94-007-7214-4-24
5. Zio, E., Pedroni, N.: Literature review of methods for representing uncertainty. Foundation for an Industrial Safety Culture, Toulouse, France (ISSN 2100-3874), 2013-03 of the Cahiers de la Sécurité Industrielle http://www.foncsi.org/en/ (2013)