Author:
Bocewicz Grzegorz,Wikarek Jarosław,Sitek Paweł,Banaszak Zbigniew
Publisher
Springer International Publishing
Reference19 articles.
1. Abernathy, W., Baloff, N., Hershey, J.: A three-stage man power planning and scheduling model - a service sector example. Oper. Res. 21, 693–711 (1973)
2. Antosz, K.: Maintenance – identification and analysis of the competency gap. Eksploatacja i Niezawodnosc – Maintenance Reliab. 20(3), 484–494 (2018)
3. Banaszak, Z., Bocewicz, G.: Declarative modeling for production order portfolio scheduling. Found. Manage. 6(3), 7–24 (2014)
4. Bombiak, E.: Human resources risk as an aspect of human resources management in turbulent environments. In: Pînzaru, F., Zbuchea, A., Brătianu, C., Vătămănescu, E.M., Mitan, A. (eds.) Shift! Major Challenges of Today’s Economy, pp. 121–132. Tritonic Publishing House, Bucharest (2017)
5. Chaari, T., Chaabane, S., Aissani, N., Trentesaux, D.: Scheduling under uncertainty: survey and research directions. In: 2014 International Conference on Advanced Logistics and Transport (ICALT), Hammamet, pp. 229–234 (2014). https://doi.org/10.1109/icadlt.2014.6866316
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献