Author:
Oke Ayodeji E.,Adetoro Pelumi E.,Stephen Seyi S.,Aigbavboa Clinton O.,Oyewobi Lukman O.,Aghimien Douglas O.
Publisher
Springer Nature Switzerland
Reference19 articles.
1. Bon-Gang, H., Xianbo, Z., & Ping, T. L. (2014). Risk Management in small construction projects in Singapore: Status, barriers and impact. International Journal of Project Management, 32(1), 116–124. https://doi.org/10.1016/j.ijproman.2013.01.007
2. Dey, P. K., & Ogunlana, S. O. (2004). Selection and application of risk management tools and technique for build-operate-transfer-projects. Industrial Management and Data System, 104(4), 334–336.
3. El-Sayegh, S. M. (2007). Risk assessment and allocation in UAE construction industry. International Journal of Project Management, 26(4), 431–438. https://doi.org/10.1016/j.ijproman.2007.07.004
4. Emam, H., Farrell, P., & Abdelaal, M. (2015). Causes of delay on large infrastructure projects in Qatar. In 31st annual ARCOM conference, September 15–17, Lincoln.
5. Hanna, A. S., Thomas, G., & Swanson, J. R. (2013). Construction risk identification and allocation: Cooperative approach. Journal of Construction Engineering and Management, 139(9), 1098–1107. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000703