1. Bordignon G (2012) “Le pietre parleranno” distruzione e ricostruzione postbellica della chiesa degli Eremitani a Padova tra storia e propaganda. In: Belli G, Centanni M (eds) Opus incertum vol 6–7: Costruzioni e ricostruzioni dell’identità italiana, vol 6–7. Polistampa, pp 156–175
2. Carpeggiani P (1975) Gli Eremintai. In: Bellinati C, Puppi L (eds) Basiliche e chiese, vol 1. Neri Pozza Editore, Vicenza, pp 217–234
3. Eastman C, Teicholz P, Sacks R, Liston K (2011) BIM handbook: a guide to building information modeling for owners, managers, designers, engineers and contractors, 2nd edn. Wiley, Hoboken, New Jersey
4. Evans R (2000) Drawn stone. In: Evans R (ed) The projective cast. The MIT press, Cambridge, pp 179–239
5. Fai S, Filippi M, Paliaga S (2013) Parametric modelling (BIM) for the documentation of vernacular construction methods: a BIM model for the commissariat building, Ottawa, Canada. ISPRS—Ann Photogramm Remote Sens Spat Inf Sci II-5/W1:115–120