Author:
Caillard Simon,Devendeville Laure Brisoux,Lucet Corinne
Publisher
Springer International Publishing
Reference9 articles.
1. High School Timetabling Project.
https://www.utwente.nl/en/eemcs/dmmp/hstt/
2. Bellenguez-Morineau, O., Neron, E.: A branch and bound method for solving multi-skill project scheduling. RAIRO Op. 41, 155–170 (2007)
3. Browning, T.R., Yassine, A.A.: Resource-constrained multi-project scheduling: priority rules. Int. J. Prod. Econ. 126, 212–228 (2010)
4. Brucker, P., Knust, S.: Resource-constrained project scheduling and timetabling. In: PATAT 2000, LNCS 2079. Springer, Heidelberg (2001)
5. Caillard, S., Brisoux-Devendeville, L., Lucet, C.: Health simulation center simusanté®’s Problem Benchmarks.
https://mis.u-picardie.fr/en/Benchmarks-GOC/
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. An ACO Algorithm for a Scheduling Problem in Health Simulation Center;Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems;2021