Publisher
Springer International Publishing
Reference12 articles.
1. Aarseth, E.: The culture and business of cross-media productions. Pop. Commun. 4(3), 203–211 (2006). https://doi.org/10.1207/s15405710pc0403_4
2. Garcia de la Banda, M., Stuckey, P., Chu, G.: Solving talent scheduling with dynamic programming. INFORMS J. Comput. 23, 120–137 (2011). https://doi.org/10.1287/ijoc.1090.0378
3. Cheng, T.C.E., Diamond, J., Lin, B.: Optimal scheduling in film production to minimize talent hold cost. J. Optim. Theory Appl. 79, 479–492 (1993). https://doi.org/10.1007/BF00940554
4. Gregory, P., Miller, A., Prosser, P.: Solving the rehearsal problem with planning and with model checking. Eur. Conf. Artif. Intell. 16, 157–171 (2004)
5. Liu, Y., Sun, Q., Zhang, X., Wu, Y.: Research on the scheduling problem of movie scenes. Discret. Dyn. Nat. Soc. 2019, 1–8 (2019). Article ID 3737105
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献