Author:
Lefoka Mochelo,Windapo Abimbola
Publisher
Springer International Publishing
Reference32 articles.
1. Barbosa, F., et al.: Reinventing Construction: A Route to Higher Productivity. McKinsey Global Institute (2017)
2. Alinaitwe, H.M., Mwakali, J.A., Hansson, B.: Factors affecting the productivity of building craftsmen - studies of Uganda. J. Civ. Eng. Manag. 13(3), 169–176 (2007)
3. Moselhi, O., Khan, Z.: Significance ranking of parameters impacting construction labour productivity. Constr. Innov. 12(3), 272–296 (2012)
4. Baloyi, L., Bekker, M.: Causes of construction cost and time overruns: the 2010 FIFA World Cup stadia in South Africa. Acta Struct. 18(1), 51–67 (2011)
5. Abdul-Rahman, H., et al.: Delay mitigation in the Malaysian construction industry. J. Constr. Eng. Manage. 132(2) (2006)