1. AUTOMAIN (2013) D4.2 Optimised maintenance activities like, grinding, tamping and other maintenance processes.
https://automain.uic.org/IMG/pdf/wp4_11-09-09-2013-f-d4_2-optimised_maintenance_activities_like_grinding_tamping_and_other_maintenance_processes.pdf
2. Al-Turki U (2011) A framework for strategic planning in maintenance. J Qual Maint Eng 17(2):150–162
3. Baldi MM, Heinicke F, Simroth A, Tadei R (2016) New heuristics for the stochastic tactical railway maintenance problem. Omega 63:94–102
4. Blischke WR, Murthy DP (2011) Reliability: modeling, prediction, and optimization. Wiley
5. CAPACITY4RAIL (2014) D5.2.1 Compendium and evaluation of RAMS, LCC and migration tools, and methods and sources of data.
http://www.capacity4rail.eu/IMG/pdf/d5.2.1_-_compendium_and_evaluation_of_rams_lcc_and_migration_tools_and_methods_and_sources_of_data.pdf