Author:
Rudnick Hugh,Velásquez Constantin
Publisher
Springer International Publishing
Reference109 articles.
1. AESO, AESO 2013 Long-term Transmission Plan (2014)
2. M. Awad, S. Broad, K.E. Casey, A.S. Geevarghese, J.C. Miller, A.J. Perez, et al., The California ISO transmission economic assessment methodology (TEAM): principles and application to Path 26. 2006 IEEE Power Engineering Society General Meeting, 8 p (2006).
https://doi.org/10.1109/PES.2006.1709178
3. R. Baldick, A. Brown, J. Bushnell, S. Tierney, T. Winter, A national Perspective: On Allocating the Costs of New Transmission Investment: Practice and Principles (2007). Retrieved from
https://hepg.hks.harvard.edu/files/hepg/files/rapp_5-07_v4.pdf
4. R. Baldick, E. Kahn, Network costs and the regulation of wholesale competition in electric power. J. Regul. Econ. 5(4), 367–384 (1993).
https://doi.org/10.1007/BF01065403
5. B. Bayer, L. Berthold, B.M.R. de Freitas, The Brazilian experience with auctions for wind power: an assessment of project delays and potential mitigation measures. Energy Policy 122, 97–117 (2018).
https://doi.org/10.1016/j.enpol.2018.07.004
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献