1. Kumar, N., Sai Kiran, K., Sadasiva Rao, K., Trivendra Reddy, S., Naveen Kumar, S.: Optimization of continuous miner operations in bord and pillar mining. Int. Res. J. Eng. Technol. 7(6), 3395–3401 (2020)
2. Banerjee, S.: Performance evaluation of continuous miner based underground mine operation system: an OEE based approach. New Trends Prod. Eng. 2(1), 596–603 (2019)
3. Prasad, M.: Underground coal mining: The way ahead.Projects Monitor, 29 December, 2008-4 January, 2009. [online] http://www.projectsmonitor.com/detailnews.asp?newsid=17688. (2009)
4. Raghwan, V., Ariff Dr, S., Kumar, P.P.: Optimum utilization of continuous miner for improving production in underground coal mines. Int. J. Sci. Res. Publ. 4(10), (2014)
5. Marepalli, R., Jain, S.C.: Optimum utilization of continuous miner used for pillar extraction in bord and pillar mining method and support requirement in various roof conditions. Int. Res. J. Eng. Technol. 6(10), 798–803 (2019)