1. Abbasian-Hosseini, S. A., Liu, M., & Hsiang, S. M. (2017). Social network conformity and construction work plan reliability. Automation in Construction.
https://doi.org/10.1016/j.autcon.2017.01.004
.
2. Anderson, E., & Weitz, B. (1989). Determinants of continuity in conventional industrial dyads. Marketing Science, 8, 310–323.
3. Arrow, H., McGrath, J. E., & Berdahl, J. L. (2000). Small groups as complex systems: Formation, coordination, development, and adaptation. Thousand Oaks, CA: Sage.
4. Bamford, J. D., Gomes-Casseres, B., & Robinson, M. S. (2003). Mastering alliance structure: A comprehensive guide to design, measure, and organization. San Francisco, CA: Jossey-Bass.
5. Belbin, R. M. (1981). Management teams: Why they succeed or fail (1st ed.). London: Butterworth-Heinemann.