1. Babushkin, A.I., Bashta, A.L., Belov, I.S.: Scheduling a three machine job shop. Avtomatika i Telemekhanika 7, 154–158 (1976). (in Russian)
2. Babushkin, A.I., Bashta, A.L., Belov, I.S.: Construction of a schedule for the counter-routes problem. Kibernetika 4, 130–135 (1977). (in Russian)
3. Banaszczyk, W.: The Steinitz constant of the plane. J. Reine und Angew. Math. 373, 218–220 (1987)
4. Bárány, I., Fiala, T.: Nearly optimum solution of multi-machine scheduling problems. Szigma 15(3), 177–191 (1982). (in Hungarian)
5. Belov, I.S., Stolin, Ja.N.: An algorithm for the single-route scheduling problem. In: Mathematical Economics and Functional Analysis. “Nauka”, Moscou, pp. 248–257 (1974). (in Russian)