1. Andres, D. D., & Doyle, P. F. (1984). Analysis of breakup and ice jams on the Athabasca river at Fort McMurray, Alberta. Canadian Journal of Civil Engineering, 11, 444–458.
2. Beltaos, S. (2014). Comparing the impacts of regulation and climate on ice-jam flooding of the Peace-Athabasca delta. Cold Regions Science and Technology, 108, 49–58.
3. Burrell, B. C., Huokuna, M., Beltaos, S., Kovachis, N., Turcotte, B., & Jasek, M. (2015). Flood hazard and risk delineation of ice-related floods: Present status and outlook. 18th workshop on the hydraulics of ice covered rivers, Quebec City, CGU-HS CRIPE.
4. Doyle, P. F. (1977). Breakup and subsequent ice jam at Fort McMurray (Report SWE-77/01). Report by the Alberta Research Council, Transportation and Surface Water Engineering Division.
5. Ettema, R. (2008). Management of confluences. In S. P. Rice, A. G. Roy, & B. L. Rhoads (Eds.), River confluences, tributaries and the fluvial network (pp. 93–118). Wiley.