1. Archana, R., Aswathy, S.K.: Analysis and design of four-legged transmission tower. Int. J. Sci. Res. 2319–7064, 1026–1030 (2015)
2. ASCE: Prestressed Concrete Transmission Pole Structures – Recommended Practices for Design and Installation, Manuals and Reports on Engineering Practice No. 123. ASCE, Reston, VA (2012)
3. Bessette-Kirton, E.K., et al.: Landslides triggered by hurricane Maria: assessment of an extreme event in Puerto Rico. GSA Today Arch. 29(6), 4–10 (2019)
4. Buldyrev, S.V., Parshani, R., Gerald Paul, H., Stanley, E., Havlin, S.: Catastrophic cascade of failures in interdependent networks. Nature 464(7291), 1025–1028 (2010). https://doi.org/10.1038/nature08932
5. Campbell, A.F.: It Took 11 Months to Restore Power to Puerto Rico after Hurricane Maria. A Similar Crisis Could Happen Again. Vox, 15 August 2018