1. Abiodun K (2020) BRT and public transportation in Lagos. This Day Newspaper. Retrieved from https://www.thisdaylive.com/index.php/2020/09/25/brt-and-public-transportation-in-lagos/
2. Allen H (2013) Africa’s first full rapid bus system: the Rea Vaya bus system in Johannesburg, Republic of South Africa. Case study prepared for the Global Report of Human Settlements. Retrieved from http://www.unhabitat.org/grhs/2013%0Ahttp://unhabitat.org/wp-content/uploads/2013/06/GRHS.2013.Case_.Study_.Johannesburg.South_.Africa.pdf
3. Ardila-Gomez A (2004) Transit planning in Curitiba and Bogota. Roles in interaction, risk, and change. Massachusetts Institute of Technology. Retrieved from https://dspace.mit.edu/handle/1721.1/28791
4. Ardila A (2005) Study of urban public transport conditions in Bogota. Retrieved from https://ppiaf.org/sites/ppiaf.org/files/documents/toolkits/UrbanBusToolkit/assets/CaseStudies/full_case/Bogata.doc
5. Asimeng ET (2021) Bus rapid transit implementation with the inclusion of incumbent paratransit operators in African cities: lessons from Accra. Urban Plann Transp Res 9(1):534–548. https://doi.org/10.1080/21650020.2021.2000485