Author:
Farouk Mostafa,Hosny Ossama
Publisher
Springer International Publishing
Reference27 articles.
1. Chambers RL (2017) Methods of forensic schedule delay analysis—pros and cons. Smith Currie, 13 Mar 2017, www.smithcurrie.com/publications/common-sense-contract-law/methods-of-forensicschedule-delay-analysis-pros-and-cons/. Web 10/02/2022
2. Faridi A, El-Sayegh S (2006) Significant factors causing delay in the UAE construction industry. Constr Manag Econ 24:1167–1176. https://doi.org/10.1080/01446190600827033
3. Marzouk M, El-Dokhmasey A, El-Said M (2008) Assessing construction engineering-related delays: Egyptian perspective. J Prof Issues Eng Educ Pract 134(3):315–326
4. Braimah N, Ndekugri I (2009) Consultants’ perceptions on construction delay analysis methodologies. J Constr Eng Manage. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000096,1279-1288
5. Abouorban H, Hosny O, Nassar K, Eltahan R (2018) Delay analysis techniques in construction project. In: Proceedings of the Building Tomorrow’s Society, Fredericton, Canada
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献