Publisher
Springer International Publishing
Reference46 articles.
1. Abrishami, S., Goulding, J., Pour Rahimian, F., & Ganah, A. (2015). Virtual generative BIM workspace for maximising AEC conceptual design innovation: A paradigm of future opportunities. Construction Innovation, 15(1), 24–41.
2. Ahmad, I., Azhar, N., & Chowdhury, A. (2019). Enhancement of IPD characteristics as impelled by information and communication technology. Journal of Management in Engineering, 35(1), 04018055. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000670.
3. AIA. (2007). Integrated project delivery: A guide. Retrieved June, 26 from https://www.aia.org/resources/64146-integrated-project-delivery-a-guide.
4. Aibinu, A., & Venkatesh, S. (2013). Status of BIM adoption and the BIM experience of cost consultants in Australia. Journal of Professional Issues in Engineering Education and Practice, 140(3), 04013021. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000193.
5. Allison, M., Ashcraft, H., Cheng, R., Klawens, S., & Pease, J. (2018). Integrated project delivery: An action guide for leaders.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献