1. Abrishami, S., Goulding, J., Rahimian, F. P., & Ganah, A. (2014). Integration of BIM and generative design to exploit AEC conceptual design innovation. Information Technology in Construction, 19, 350–359. http://www.itcon.org/2014/21.
2. Ahmad, I., Azhar, N., & Chowdhury, A. (2018). Enhancement of IPD characteristics as impelled by information and communication technology. Journal of Management in Engineering, 35(1), 04018055. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000670.
3. Ahmad, I., Azhar, N., & Chowdhury, A. (2019). Enhancement of IPD characteristics as impelled by information and communication technology. Journal of Management in Engineering, 35(1), 04018055. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000670.
4. Allison, M., Ashcraft, H., Cheng, R., Klawans, S., & Pease, J. (2017). Integrated project delivery an action guide for leaders. Retrieved December 20, from https://www.leanconstruction.org/lci-news/integrated-project-delivery-an-action-guide-for-leaders/.
5. Alves, T. d. C. L., Lichtig, W., & Rybkowski, Z. K. (2017). Implementing target value design: Tools and techniques to manage the process. HERD: Health Environments Research & Design Journal, 10(3), 18–29. https://doi.org/10.1177/1937586717690865.