1. Adenikinju, A. F. (2003). Electric infrastructure failures in Nigeria: A survey-based analysis of the costs and adjustment responses. Energy Policy, 31(14), 1519–1530. https://doi.org/10.1016/S0301-4215(02)00208-2
2. Ahmed, I. (2021). The political economy of energy mix in hydropower dependent developing nations–a case study of Zambia. University College London. https://discovery.ucl.ac.uk/id/eprint/10121236/.
3. Ahmed, I., Baddeley, M., Coffman, D., Meikle, J., Oseni, M., & Sianjase, G. (2019). The cost of power outages to Zambia’ s manufacturing sector. https://www.theigc.org/wp-content/uploads/2019/08/Ahmed-et-al-2019-policy-brief-41408.pdf. https://doi.org/F-41408-ZMB-1
4. Ahmed, I., Parikh, P., Sianjase, G., & Coffman, D. (2020, December 4). The impact decades long dependence on hydropower in El Niño impact-prone Zambia is having on carbon emissions through diesel backup generation. Environmental Research Letters, 15(12) https://doi.org/10.1088/1748-9326/abb6a1
5. Allcott, H., Collard-Wexler, A., & O’Connell, S. D. (2015). How do electricity shortages affect industry? Evidence from India, NBER Working Paper Series 19977, Cambridge, MA. https://doi.org/10.1257/aer.20140389