1. AfDB. (2013). AfDB approves US $150-million loan to support access to reliable electricity supply in Zambia, AfDB website. Retrieved May 25, 2020, from https://www.afdb.org/en/news-and-events/afdb-approves-us-150-million-loan-to-support-access-to-reliable-electricity-supply-in-zambia-12334
2. Africa Power Ventures. (2018). SAPP market analysis. Ebene.
3. African Energy. (2014, May 30). Zambia: Maamba plant delayed by transmission hold-up. African Energy Newsletter. https://www.africa-energy.com/article/zambia-maamba-plant-delayed-transmission-hold
4. Ahmed, I. (2017, March 27). Leapfrogging into the light. Financial Times. https://www.ft.com/content/41524878-108f-11e7-b030-768954394623
5. Ahmed, I. (2020). Explaining Rwanda’s prioritisation of rural electrification over rural clean drinking water through institutional path dependency. Structural Change and Economic Dynamics, 54(September), 186–201. https://doi.org/10.1016/j.strueco.2020.05.001