Publisher
Springer International Publishing
Reference11 articles.
1. Batur, G.D., Karasan, O.E., Akturk, M.S.: Multiple part-type scheduling in flexible robotic cells. Int. J. Prod. Econ. 135(2), 726–740 (2012)
2. Bożejko, W., Pempera, J., Wodecki, M.: Minimization of the number of employees in manufacturing cells. In: Graña, M., López-Guede, J.M., Etxaniz, O., Herrero, Á., Sáez, J.A., Quintián, H., Corchado, E. (eds.) International Joint Conference SOCO’18-CISIS’18-ICEUTE’18, pp. 241–248. Springer (2019)
3. Bożejko, W., Pempera, J., Wodecki, M.: Minimal cycle time determination and golf neighborhood generation for the cyclic flexible job shop problem. Bull. Pol. Acad. Sci.: Tech. Sci. 66(3), 333–344 (2018)
4. Brucker, P., Kampmeyer, T.: Cyclic job shop scheduling problems with blocking. Ann. Oper. Res. 159, 161–181 (2008)
5. Chtourou, S., Manier, M.A., Loukil, T.: A hybrid algorithm for the cyclic hoist scheduling problem with two transportation resources. Comput. Ind. Eng. 65(3), 426–437 (2013)
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Performance Modeling;Declarative Models of Concurrent Cyclic Processes;2023
2. Consideration of processing time dissimilarity in batch-cyclic scheduling of flowshop cells;International Journal of Production Research;2020-09-21