Author:
Manda E.,Mwanaumo E.,Thwala W. D.,Kasongo R.,Chisumbe S.
Publisher
Springer International Publishing
Reference49 articles.
1. Aigbavboa, C.O., Thwala, W.D., Mukuka, M.J.: Construction project delays in Lusaka, Zambia: causes and effects. J. Econ. Behav. Stud. 6(11), 848–857 (2014)
2. Alkhoraif, A., Rashid, H., McLaughlin, P.: Lean implementation in small and medium enterprises: literature review. Oper. Res. Perspect. 6, 100089 (2019)
3. Ansah, R.H., Sorooshian, S., Mustafa, S.B.: Lean construction: an effective approach for project management. ARPN J. Eng. Appl. Sci. 11(3), 1607–1612 (2016)
4. Arif-Uz-Zaman, K., Ahsan, A.N.: Lean supply chain performance measurement. Int. J. Prod. Perform. Manag. 63, 588–612 (2014)
5. Aziz, R.F.: Applying lean thinking in construction and performance improvement. Alex. Eng. J. 52(4), 679–695 (2013)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献