1. Bachurina, S., Sultanova, I.: The concept of creating an economic and visual model - a tool for increasing the efficiency of investment and construction projects. Urban Plan. 1(35), 11–14 (2015)
2. Bachurina, S., Sultanova, I.: Organization of construction production: stages of development and current state. Actual Prob. Soc.-Econ. Develop. Russia 4, 67–70 (2014)
3. Application of Advanced Construction Technologies of New Nuclear Power Plants: MPR-2610, Revision 2 U.S.: Department of Energy (2004)
4. McGraw, H.: ConstructionThe Business Value of BIM in North America: Multi-Year Trend Analysis and User Ratings (2007–2012). Smart Market Report (2012). www.construction.com
5. Lapidus, A., Avetisyan, R., Mirzakhanova, A., Kazaryan, R.: Prospects for the development of BIM technologies on the territory of the Russian federation system engineering in construction. Cyber-physical building systems 331–334 (2019)