Publisher
Springer Nature Switzerland
Reference23 articles.
1. Apache Spark. https://spark.apache.org/
2. PSPLIB - Project Scheduling Library. http://www.om-db.wi.tum.de/psplib
3. Chakrabortty, R.K., Abbasi, A., Ryan, M.J.: Multi-mode resource-constrained project scheduling using modified variable neighborhood search heuristic. Int. Trans. Oper. Res. 27(1), 138–167 (2020). https://doi.org/10.1111/itor.12644
4. Elsayed, S., Sarker, R., Ray, T., Coello, C.C.: Consolidated optimization algorithm for resource-constrained project scheduling problems. Inf. Sci. 418–419, 346–362 (2017). https://doi.org/10.1016/j.ins.2017.08.023
5. Glover, F., Laguna, M.: Tabu Search. Kluwer Academic Publishers, Norwell, MA, USA (1997)