Author:
dos Santos Djenane C. S.,de Souza Adler D.,Mota Flávio B. S.
Publisher
Springer International Publishing
Reference15 articles.
1. A.D. Souza, A.R.C. Rocha, D.C.S. Santos, A proposal for the improvement of project’s cost predictability using earned value management and historical data of cost – an empirical study. Int. J. Software Eng. Knowl. Eng. 25(01), 27–50 (2015). https://doi.org/10.1142/s0218194015400021
2. I. Robert Chiang, M.A. Nunez, Strategic alignment and value maximization for IT project portfolios. Inf. Technol. Manag. 14(2), 143–157 (2013). https://doi.org/10.1007/s10799-012-0126-9. ISSN: 1385951X
3. M. Padovani, M.M. Carvalho, A.R. Muscat, Project portfolio adjustment and balance: a case study in the chemical sector. Produção 22(4), 674–695 (2012). https://doi.org/10.1590/S0103-65132012005000064. ISSN: 19805411.
4. Project Management Institute (PMI), A guide to the project management body of knowledge (Guia PMBOK®), 5th edn. (Project Management Institute, Inc., Pennsylvania, 2013)
5. P. de Araújo Farias, C.M. de Lima, S.B.S. Monteiro, A.C.B. Reis, Proposal of a prioritizing method for it infrastructure projects. RISTI 2020(E27), 763–776 (2020). ISSN: 16469895.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献