Publisher
Springer International Publishing
Reference33 articles.
1. Akbarzadeh, M., Esmaeili, M., & Taleizadeh, A. A. (2015). EPQ model with scrap and backordering under vendor managed inventory policy. Journal of Industrial and Systems Engineering, 8(1), 85–102.
2. Akbarzadeh, M., Taleizadeh, A. A., & Esmaeili, M. (2016). Developing economic production quantity model with scrap, rework and backordering under vendor managed inventory policy. International Journal of Advanced Logistics, 5(3–4), 125–140.
3. Chiu, S. W. (2008). Production lot size problem with failure in repair and backlogging derived without derivatives. European Journal of Operational Research, 188(2), 610–615.
4. Chiu, S. W., Wang, S. L., & Chiu, Y. S. P. (2007). Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, 180(2), 664–676.
5. Chiu, S. W., Lin, H. D., Wu, M. F., & Yang, J. C. (2011b). Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues. Scientia Iranica, 18(6), 1537–1544.