Publisher
Springer International Publishing
Reference11 articles.
1. Doganay, K., Bohlin, M.: Maintenance plan optimization for a train fleet. WIT Trans. Built Environ. 114, 349–358 (2010)
2. Gu, H., Joyce, M., Lam, H.C., Woods, M., Zinder, Y.: A genetic algorithm for assigning train arrival dates at a maintenance centre. In: 9th IFAC Conference on Manufacturing Modelling, Management and Control (MIM), Berlin, Germany, 28–30 August 2019 (2019)
3. Keller, B., Bayraksan, G.: Scheduling jobs sharing multiples resources under uncertainty: a stochastic programming approach. IIE Trans. 42, 16–30 (2010)
4. Lai, Y.C., Fan, D.C., Huang, K.L.: Optimizing rolling stock assignment and maintenance plan for passenger railway operations. Comput. Ind. Eng. 85, 284–295 (2015)
5. Li, H., Demeulemeester, E.: A genetic algorithm for the robust resource leveling problem. J. Sched. 19(1), 43–60 (2016)
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献