Author:
Kudryavtseva V. D.,Litvinovsky E. M.,Shchelokova T. N.,Tararushkin E. V.
Publisher
Springer International Publishing
Reference26 articles.
1. Syrcova ED (1972) Matematicheskiye metody v planirovanii i upravlenii stroitel'nym proizvodstvom. Uchebnoye posobiye. Moscow, Vysshaya shkola
2. Caprara A, Fischetti M, Toth P, Vigo D, Guida PL (1997) Algorithms for railway crew management. Math Program 79(1):125–141
3. Caprara A, Toth P, Vigo D, Fischetti M (1998) Modeling and solving the crew rostering problem. Oper Res 46(6):820–830
4. Abbink EJW, Albino L, Dollevoet T, Huisman D, Roussado J, Saldanha RL (2011) Solving large scale crew scheduling problems in practice. Public Transp 3(2):149–164
5. Suyabatmaz AÇ, Şahin G (2015) Railway crew capacity planning problem with connectivity of schedules. Transp Res Part E: Logistics Transp Rev 84(C):88–100. https://doi.org/10.1016/j.tre.2015.10.003